STH 60 & Granville Intersection Project
WisDOT Suspends STH 60 Corridor Study

Click here to view the Suspension Letter

Visit a WisDOT "Fast Facts" webpage on this project.

Click here to print off a WisDOT comment form.



Project Name

Description

STH 60 & Granville Intersection Project STH 60 is planned to have an overlay from Eagle Dr in Jackson to the 5 Corners intersection in the Town of Cedarburg. In addition to the overlay, the State will be reconstructing the intersection of STH 60 and CTH Y with a single lane roundabout. The design includes accommodations for bicycles via paved shoulders around the intersection. The work will include but not be limited to mill and overlay of pavement, adding/extending bypass lanes and right turn lanes at intersections, and widening paved shoulders to 6 feet to accommodate bicycles. Intersections planned for improvements include: Maple Road, Center Road, Lusan Drive, Church Road, Briarwood Drive, Elm Drive, County M, Strawberry Glen Road, Lizbeth Lane, and Horns Corners Road. Construction for the WIS 60 resurfacing project is currently scheduled for 2020. Real estate and/or easement acquisition for the project is currently scheduled to begin in 2016-2017. The road will be closed to through traffic during construction, and a detour route will be posted. Local and emergency access would be maintained throughout the project.


STH 60 & Granville Intersection Project

Document / Link

Project Description

Project Description

Project Map

Project Location Map

Roundabout Option Plan (Feb. 2014)

Roundabout Plans

Alternatives Comparison Table (Feb. 2014)

Comparison Table

Ozaukee County Resolution Requesting Expedited Reconstruction (April 2014)

Resolution

Meeting summary with Local Officials: April 30, 2015

Summary

Meeting summary with Local Officials: Jan. 29, 2014

Summary

Public Involvement Handout (Feb. 2014)

Handout

WisDOT Roundabout Brochure

Brochure




STH 60 Corridor Study
Click here to sign up for eNotify to stay updated on the study.
Visit the Citizen Group Website STH 60 - "Mi60"
Click here to view a Speed Study for Lizbeth Lane to 1st Ave.
Click here to print the comment sheet for DOT (no comment deadline).

WisDOT Contacts

Deb Tarnow, P.E., WisDOT Project Manager
(262)-548-8794 Deb Tarnow
Lindsay Necci, WisDOT SE Region Communication Specialist (262) 548-8721 Lindsay Necci

Wisconsin Department of Transportation (WisDOT) Southeast Region
141 NW Barstow St. P.O. Box 798
Waukesha, WI 53187-0798
Phone: (262) 548-5902 Fax: (262) 548-5662


Project Name

Description

STH 60 Study While STH 60 from Five Corners to 1st Avenue in Grafton had several inches of asphalt pavement replaced in 2010, WisDOT has begun a corridor study of 12 miles of WIS 60 in order to analyze the existing and projected conditions on WIS 60 through 2040. The study will evaluate alternatives to accommodate anticipated changes in traffic volumes and regional development. The study team, with input from local officials, environmental specialists, regional transportation professionals, the local community, and other specialized representatives will develop and refine alternatives for addressing safety and operational concerns along the corridor. The final outcome of the study will be an approved environmental document outlining the preferred alternative and the impacts to the environment and the surrounding communities. Below are a series of helpful links that provide information related to this study.


WisDOT Presentation and STH 60 Plans
from February 20, 2013 at Cedarburg Town Hall

Document / Link

STH 60 Corridor Study from 2-20-13

Presentation

Five Corners to Keup Road - Section View

Section View

County Line to Five Corners - Section View

Section View

CTH I Roundabout Intersection

Map photo

CTH I Signalized Intersection

Map photo

CTH Y Roundabout Intersection

Map photo

CTH Y Signalized Intersection

Map photo

Keup Road Roundabout Intersection

Map photo

Keup Road Signalized Intersection

Map photo

5 Corners 4-Leg Roundabout & Sycamore 4-Leg Roundabout

Map photo

5 Corners 5-Leg Roundabout

Map photo

5 Corners Signal / Closed Covered Bridge Access / Signalized Sycamore

Map photo



STH 60 Document / Map

Document / Link

Bypass Screening Memorandum (NEW Posted 3-12-14)

Memo

WisDOT Archeological Notification Letter to Residents

View Letter

Presentation to Ozaukee Economic Development

Presentation

Special Town Board meeting memo from 2-20-13 meeting

Memo

Town Resolution Opposing WisDOT's WIS 60 Corridor Preliminary Alternatives

Resolution

Ozaukee County Board Resolution Opposing WisDOT's WIS 60 Corridor Preliminary Alternatives

County Board Resolution

Town Letter to WisDOT (7-13-12)

Town Letter

Landmarks Commission statement supporting preservation of Landmark Buildings & opposing negative impacts on the buildings.

Landmarks Commission Statement

DOT STH 60 webpage

Webpage

Ozaukee County Four Lane Rural Road Sections

North/South Options Map

Five Corners Bypass Alternatives

Bypass Alternative Map

Exhibits/maps/alternatives (Cedarburg, Grafton & Jackson)

General Webpage

Project Schedule (subject to change)

Project Schedule

Public Information Meeting Presentation

Presentation